Structure Performance Evaluation of the Design of a Hospital Building Using the Pushover Method

Authors

  • Seto Ditosurya Aranta Department of Civil and Environmental Engineering, Gadjah Mada University
  • Inggar Sephia Irawati Department of Civil and Environmental Engineering, Gadjah Mada University

DOI:

https://doi.org/10.31815/jp.2025.20.11-21

Keywords:

Performance evaluation, structural performance, reinforced concrete structure, nonlinear static analysis, hospital

Abstract

The structural design of a 10-story inpatient hospital building in Magelang has been completed using the dynamic linear analysis method. Considering that Indonesia is an earthquake-prone country, it is essential to evaluate the structural performance of the design results.  This evaluation aims to determine whether the target performance of Immediate Occupancy and Life Safety has been achieved for seismic levels BSE-1N and BSE-2N, respectively. Performance evaluation was then performed using static nonlinear methods based on ASCE 41-17, referred for the draft of the Indonesia Standard Code for Seismic Evaluation and Retrofit of Existing Buildings. Structural geometry modeling uses results from the previous design steps. Then, the modeling is assigned material nonlinear parameters, cross-sectional nonlinearity, and element nonlinearity. The direction of the pushover lateral load in this analysis is divided into 4 directions, i.e., positive X, negative X, positive Y, and negative Y. Based on the results of the analysis, it is known that the structural performance does not meet the requirements of ASCE 41-17 at both BSE-1N and BSE-2N seismic levels. Based on the results of checking the requirement ratio of the elastic strength demand to yield strength toward the maximum strength ratio, it is recommended that the analysis be continued using the dynamic nonlinear method.

References

Adhitama, Yuliar Azmi, Bambang Supriyadi, Bambang Suhendro. (2022). Evaluasi Seismik Gedung Bertingkat Eksisting Menggunakan Prosedur ASCE 41-17. Jurnal Riset Rekayasa Sipil UNS. Vol 6, No.1, 1-10.

Anam, Syaiful, Bantot Sutriono, Retno Tri Murtiningrum. (2020). Studi Perbandingan Kinerja Gedung Beton Bertulang SRPMK 6 Lantai Dengan Menggunakan Metode Pushover dan Nonlinear Time History Analysis. Jurnal “MITSU” Media Informasi Teknik Sipil UNIJA. Vol 8, No.1, 33-41.

Arima, Redha R.M., Roni Sani Saputra, Masrilayanti, Ruddy Kurniawaran. (2023). Pushover Analysis of 6-Floors Irregular Building Structure (Case Study: Fave Hotel Building-Padang City, West Sumatra). Educational Journal of History and Humanities. 6(3), 859-871.

American Society Civil Engineering. (2017). ASCE Standard 41-17 Seismic Evaluation and Retrofit of Existing Buildings. United States of America: American Society of Civil Engineers.

American Society Civil Engineering. (2016). ASCE 7-16. 2016. Minimum Design Loads and Associated Criteria for Buildings and Other Structures. United States of America: American Society of Civil Engineers.

Aulia, Diana Fika, Ignatius Sudarsono, Fauzia Mulyawati. (2022). Evaluasi Kinerja Struktur Gedung Bertingkat dengan Pemodelan Struktur (3D) Berdasarkan Analisis Statik Beban Dorong (Pushover Analysis). Journal of Civil Engineering and Vocational Education. Vol 9, No.3, 248-252.

Dewi, Hesty Auliya, Erno Widayanto, Ketut Aswatama Wiswamitra. (2023). Analisis Kinerja Struktur Gedung Bertingkat Menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK) pada Pembangunan Rumah Susun Cakung Jakarta Timur. Jurnal Ilmiah Rekayasa Sipil. Vol 17, No.3, 243-248.

Mander, J.B, M.J.N. Priestley, R. Park. (1988). Theoretical Stress-Strain Model for Confined Concrete. Journal Stucture Engineering. 114(8), 1804-1826.

Nurrohmat, Farhan, Ratna Widyawati, Fikri Alami. (2020). Evaluasi Bangunan Gedung Rumah Sakit Terhadap Beban Gempa dengan Menggunakan Metode Statik Ekuivalen. JRSDD. Vol 8, No.3, 295-404.

Pangestu, Saifulloh Fatah, dan Pratama M. Mirza Abdillah. (2021). Evaluasi Kinerja Struktur Gedung Bertingkat Menggunakan Pendekatan Desain Berbasis Kinerja (Studi Kasus: Gedung Pendidikan Rangka Beton Bertulang 7 Lantai). Jurnal Analisis dan Kajian Bidang Teknik Sipil. Vol 10, No.2, 91-100.

Pemerintah Kota Magelang. (2023). Perencanaan DED Gedung Rawat Inap RSUD Tidar Kota Magelang Tahun 2023. Pemerintah Kota Magelang.

Prismastanto, Novi. (2019). Metode Analisis Ragam Spektrum Respons Pada Struktur Gedung Bertingkat (Studi Kasus Hotel Tosan, Solo Baru). Jurnal Media Komunikasi Dunia Ilmu Sipil. Vol 1, No.1, 25-34.

Rifai, Muhamad, Fikri Alami, Mohd Isneini, Masdar Helmi. (2022). Evaluasi Kinerja Struktur Gedung Bertingkat Dengan Analisis Time History (Studi Kasus: Rumah Sakit Umum Muhammadiyah Metro). JRSDD. Vol 10, No.1, 99-114.

Sarasanty, Diah, dan Zainul Arifin. (2022). Respons Spectrum Analysis Struktur Bangunan Tingkat Tinggi (Studi Kasus: Bangunan Rumah Susun Stasiun Tanjung Barat di Jakarta). Jurnal Kacapuri. Vol 5, No.1, 140-149.

BSN. 2019. SNI 1726:2019-Tata Cara Perancangan Ketahanan Gempa untuk Struktur Bangunan Gedung dan Non Gedung. Jakarta: Badan Standardisasi Nasional.

BSN. 2020. SNI 1727:2020-Beban Desain Minimum dan Kriteria terkait untuk Bangunan Gedung dan Struktur Lain. Jakarta: Badan Standardisasi Nasional.

BSN. 2019. SNI 2847:2019-Persyaratan Beton Struktural untuk Bangunan Gedung dan Penjelasan. Jakarta: Badan Standardisasi Nasional.

Sunarso, Agus, Kusiman Joko, Reki Arbianto. (2023). Perencanaan Struktur Gedung Perkantoran Tujuh (7) Lantai di Kabupaten Karanganyar. Journal of Civil Engineering and Infrastructure Technology.

Sweiga, Abadi Grafita Yans. (2023). Analisis Pushover pada Bangunan Rumah Sakit dengan Ketidakberaturan Vertikal Berdasarkan ASCE 41-17. Universitas Gadjah Mada.

Syahputra, Ridho, Irwan, Ahmad Sumantri. (2021). Evaluasi Kinerja Struktur Pada Gedung Jamaliah Yayasan Syafiatulamaliyah Medan Berdasarkan SNI 1726:2019. Buletin Utama Teknik. Vol 17, No.1, 98-105.

Usman, Arie Putra, Rosidawani, Sri Palta Mutmainna. (2021). Analisis Respons dan Kinerja Struktur Bangunan Gedung Menggunakan Pushover Analysis. Jurnal Saintis. Vol 21, No.2, 87-96.

Downloads

Published

05/15/2025

How to Cite

Ditosurya Aranta, S., & Sephia Irawati, I. (2025). Structure Performance Evaluation of the Design of a Hospital Building Using the Pushover Method. Jurnal Permukiman, 20(1), 11–21. https://doi.org/10.31815/jp.2025.20.11-21

Issue

Section

Artikel